@FBIsomalia
Have u noticed they never publish the current and predicted growth in terms of load of vehicles(mass) and volume(quantity) per day, month, year? This will tell us what the type of material(asphalt or concrete) is better value and return on investment(last longer).
They don't even provide the levelling material used on the earth or the sub base materials above it and the strength and grade of it or the base course(which is what u see) and its material and bitumen used. The materials can only last so long under load, stress, natural elements(it's measured in thickness). Korka Bay qurux ka dhigan not the sub base or earth level.
I'll do a fire hose test on each road built and rate the flow strength(from the fire dept) and find out which material was used based on results that way because each are tested under load or natural element testing and u can quickly google why did this road base break apart at this strength of water or volume or vehicle volume and u can find out what material and grade was selected vs the prices charged to PL govt.
Somalis hate evidence based approaches and accountability and isla hisabtan. Their probably charging premium prices and delivering low grade material. Their xasid in Somalia they don't want to do a job well done because they want it to break apart(repeat business).