As we are preparing to enter 202- Oh right you heard me correct, Puntland Republic. Some will call me a "closet secessionist" but if we have a Republican style government I’m afraid it’s a Republic. And what does the future hold for this Republic?
Garacad port
Garacad port will be operational within 6 months and be able to handle a single 5000mt ship. The construction will continue while the port is operational and construct 2 more quays. At a single time the port will be able to handle 2 x 10,000mt or a single 30,000mt ship. This will mean it will be the same size as Kismayo port.
Eyl port/road
We don't know much about Eyl port other than the contractor is CCECC who also built the runway in Bosaso. The deal is an MOU signed in June 2019. The road is currently undergoing surveying.
http://www.globalconstructionreview.com/news/china-signs-deal-build-port-ancient-somalian-town-/
These roads are either being surveyed or under construction.
Galkayo-Garowe
Garowe-Bosaso
Garowe-Eyl
Badhan-Ceeldahir
I'm not going to include Wadaagsin since it's not tarmac and I'm not going to include Bosaso port project cause at this stage Garacad will be finished before Bosaso. That's some shameful sht.
Garacad port
Garacad port will be operational within 6 months and be able to handle a single 5000mt ship. The construction will continue while the port is operational and construct 2 more quays. At a single time the port will be able to handle 2 x 10,000mt or a single 30,000mt ship. This will mean it will be the same size as Kismayo port.
Eyl port/road
We don't know much about Eyl port other than the contractor is CCECC who also built the runway in Bosaso. The deal is an MOU signed in June 2019. The road is currently undergoing surveying.
http://www.globalconstructionreview.com/news/china-signs-deal-build-port-ancient-somalian-town-/
These roads are either being surveyed or under construction.
Galkayo-Garowe
Garowe-Bosaso
Garowe-Eyl
Badhan-Ceeldahir
I'm not going to include Wadaagsin since it's not tarmac and I'm not going to include Bosaso port project cause at this stage Garacad will be finished before Bosaso. That's some shameful sht.