104km road being constructed by Chinese CCECC company at a cost of approximately 1.5 billion Birr ($26.9 million)
Last edited:
@GaradShabeel Will this road go through Tuli Guleed? I've seen some Geri saying that on FB.
Then it must also be going through Jaare.Yeah. It will go from Jigjiga through Tuli and Samakaab towards Haramukaale.
Then it must also be going through Jaare.
Only downside for us is that you won't be needing Lafaciise route to get to Jigjiga anymore. We should work together so we can get one paved further down to Lafaciise.![]()
I'm actually not sure, but there could be existing dirt roads. There's currently a road that's going to connect Jaare to Shabele and Dibirawayn in Dambal in the works.Isn't there already a road linking Jaare, Dambal and the main DD-Djibouti road? I could be wrong, but I think that the road is being mostly being built on unpaved land and passes through some of the mountainous areas west of Tuli.
Redirecting traffic is always great. I ain't complaining
It would be great to connect to LafaCisse as well. But this project was signed/financed by the federal authorities (The Ethiopian Roads Authority). We need to extort Oromia who wants roads linking East Hararghe with Awdal. I'm sure they would fund such a road going through both districts
http://www.xinhuanet.com/english/2018-12/14/c_137672551.htm